Beon Energy

Quorn Park 132kV/33kV Substation & Battery Hybrid Project

Scope:  

SEC acted as the lead electrical contractor for the installation, testing and commissioning of all electrical systems across the new 132kV/33kV substation and hybrid battery facility. Works included HV installation, protection systems, control wiring, and integration with the broader network infrastructure.

Result:  

SEC supplied the required labour and technical capability to meet the project’s demanding schedule, delivering works on time. This project continues our long‑standing relationship with Beon Energy across multiple high‑voltage assets